Barossa Winery 480kW PV + 1MWh BESS
Site Challenge & Scope
Scope: 480kW rooftop solar array paired with 1MWh liquid-cooled LFP peak-shaving battery storage.
Vintage refrigeration spikes drove severe SA Power Networks kVA demand charges between 4pm and 9pm while solar export was capped at 100kW.
Engineered Solution
Engineered zero-export dynamic control capturing midday excess into a 1MWh BESS that discharges automatically across the 4pm to 9pm demand window.
Verified Outcome
Reduced annual refrigeration power bill by $184,000, achieving a verified 2.9-year payback.