Grid-Scale Battery Storage (BESS)
Commercial peak-shaving, tariff arbitrage, and backup microgrid systems engineered for South Australian evening demand peaks.
100kW to 2MW industrial rooftop solar PV, grid-scale battery storage, and HV main switchboard upgrades engineered for Adelaide wineries, cold storage, and factories.
Direct in-house capability across Adelaide & Barossa, SA, backed by SA PGE #294810 | CEC Approved and $20M public liability.

Commercial peak-shaving, tariff arbitrage, and backup microgrid systems engineered for South Australian evening demand peaks.

Main switchboard upgrades, SAPN export limiting, power factor correction, and thermographic compliance auditing.
Tier-1 N-type bifacial rooftop arrays and architectural solar EV charging canopies for commercial fleets and business parks.
Structured hold points, clear programme milestones, and digital handover documentation with zero variation surprises.
We analyse 12 months of 15-minute NMI meter data to model exact kVA demand savings and payback.
CPEng roof structural sign-off, single-line diagrams, and SAPN grid connection approval.
Pre-wired AS/NZS 61439 switchboards and Tier-1 PV/BESS equipment staged at Regency Park.
Zero-disruption roof works, height-safety edge protection, and weekend MSB cutovers.
Grid protection commissioning, LGC registration, and live SCADA performance handover.
Built around fixed-price certainty, owned capacity, and audit-ready compliance across SA.
No inflated sales brochures. Every financial model is built directly on your last 12 months of SA Power Networks interval data.
We handle 100kW to 2MW network studies, dynamic export relays, and SAPN witness testing without third-party delays.
Cold stores, wineries, and factories stay operational via planned weekend switchboard changeovers.
Zero backpacker subcontract crews. Every array and BESS is installed by our employed Adelaide trades.
Full Clean Energy Regulator documentation and LGC forward-contract setup to maximise cashflow.
Backed by proactive SCADA string monitoring, annual thermography, and Regency Park spare parts.
Representative commercial contracts completed with verified safety, engineering, and margin control.
480kW rooftop solar array paired with 1MWh liquid-cooled LFP peak-shaving battery storage.
Reduced annual refrigeration power bill by $184,000, achieving a verified 2.9-year payback.
750kW high-yield industrial roof array plus 1200A main switchboard upgrade and power-factor correction.
Zero cold-chain temperature excursion and 1,180 MWh verified first-year clean generation.
220kW structural steel solar carport shading 64 bays with 12x 22kW load-balanced fleet EV chargers.
5-Star NABERS rating achieved ahead of tenant lease renewal with $78,000/yr energy offset.
Inspect mobilisation lead times and depot logistics directly from 29 Days Rd, Regency Park SA 5010.
Cold storage, logistics hubs, shopping centres, and commercial offices across Greater Adelaide.
We engineer dynamic export-limiting relays and size BESS storage from your 15-minute NMI interval data so zero midday solar is wasted while evening demand peaks are shaved.
No. Roof installation runs live with zero interruption, and main switchboard tie-ins are scheduled in a planned 2 to 3 hour weekend window.
Yes. Every system over 30kW includes an independent CPEng structural wind and dead-load certificate suitable for landlords and insurers.
Systems up to 100kW receive an upfront STC discount; systems over 100kW generate tradeable LGCs every year through to 2030, which we register and manage for you.
Yes. Our Adelaide switchboard team builds AS/NZS 61439 Form 3b and 4b boards in-house so solar, BESS, and EV capacity integrate cleanly.
25-year linear panel performance warranty, 10-year commercial inverter and BESS warranties, plus our 5-year whole-of-system workmanship guarantee.
Run indicative numbers in our dedicated commercial estimator, print our 2-page A4 capability dossier, or inspect live job margins inside our Xero Owner Portal.