Approval strategy decides your timeline more than any other choice. We map the fastest compliant pathway in week one, then build the design and documentation around it.

Woollahra · Waverley · MosmanNorthern Beaches · Stonnington · Bayside

DA vs CDC Pathway Comparator

Which approval fits your site?

Choose the scenario closest to your project. The comparator sets a Development Application against Complying Development for time, cost, and risk.

Complying Development

Eligible

Typical determination

3 to 6 weeks

  • Consultant & certifier cost$6k to $12k certifier & reports
  • Risk profileLow: strict numeric controls, no merit argument

Development Application

Always available

Typical determination

16 to 24 weeks

  • Planning & report cost$18k to $35k planning & reports
  • Risk profileModerate: neighbour notification and submissions

New dwelling on a standard lot

Complying Development is usually fastest if the design fits the Housing Code setbacks and height planes.

Ask about my site

Illustrative NSW timeframes and costs based on typical metropolitan councils. Victorian projects follow the Planning Permit and VicSmart pathways. Not planning advice.

Five stages · One accountable studio

Five stages, one studio.

Stage 01 · Typical duration 2 to 4 weeks

Feasibility

We confirm what the site can carry before a single line is drawn, so the brief is grounded in council reality.

Deliverables

  • Site analysis & solar study
  • Planning controls review (LEP, DCP, overlays)
  • Indicative yield and construction budget

Consultant coordination

Surveyor, planning consultant, arborist screening

Stage 02 · Typical duration 6 to 8 weeks

Sketch Design

Ideas are tested in light, section, and cost at the same time, and our percentage fee converts to a fixed lump sum once Sketch Design is signed off.

Deliverables

  • Two to three massing options
  • Physical study model at 1:200
  • Independent QS cost check before DA

Consultant coordination

Independent quantity surveyor, structural engineer (concept)

Stage 03 · Typical duration 3 to 36 weeks

DA & CDC

We choose the fastest compliant pathway: Complying Development where it fits, a fully argued DA where it does not.

Deliverables

  • Statement of Environmental Effects
  • Shadow diagrams & view analysis
  • Pre-lodgement meeting with council

Consultant coordination

Town planner, heritage advisor, BASIX & NatHERS assessor

Stage 04 · Typical duration 10 to 16 weeks

Documentation

Every junction is resolved on paper so the builder prices certainty instead of risk.

Deliverables

  • Construction Certificate set
  • 1:20 joinery & 1:5 junction details
  • Finishes schedule & specification

Consultant coordination

Structural, hydraulic, lighting, landscape architect

Stage 05 · Typical duration 12 to 24 months

Contract Admin

We administer the ABIC building contract independently on site through handover, protecting design intent, variations, and finish quality.

Deliverables

  • Competitive select tender across 3 vetted builders
  • ABIC MW/SW contract administration & fortnightly walks
  • Progress claim certification & defects

Consultant coordination

Builder, certifier, specialist trades

  • Site Feasibility
  • Complying Development
  • Council DA
  • 1:20 Joinery Details
  • Passive Solar Modelling
  • Tender Administration
  • Defect Inspections
  • Site Feasibility
  • Complying Development
  • Council DA
  • 1:20 Joinery Details
  • Passive Solar Modelling
  • Tender Administration
  • Defect Inspections

Consultant team

We coordinate the whole table.

Specialist consultants are engaged directly by you on our vetted scopes, while we act as Lead Consultant coordinating every discipline so drawings arrive at council and on site as one consistent set.

Structure

Structural & civil

Cantilevers, geotech, retaining on sloping headlands, and OSD stormwater resolved before DA.

Compliance

NCC 2022, 7-Star NatHERS & BASIX

7-star thermal shell, Whole-of-Home energy, NSW BASIX, and BAL bushfire assessments run in parallel with sketch design.

Heritage

Heritage & planning

Heritage Impact Statements and Statements of Environmental Effects written alongside the design.

Commission the studio

Let's talk.

Every commission begins with a site walk and an unhurried conversation about light, budget, and how you want to live. We take on eight new residences a year.

Start a conversation
  • PrincipalJulian Vance · NSW Nominated Architect Reg. No. 11204 (Illustrative)
  • PrincipalClara Kestrel · VIC ARBV Reg. No. 20418 (Illustrative)
  • StudiosPaddington NSW studio · Armadale VIC design room by appointment · AIA A+ Practice (Illustrative)

Council territory

  • WoollahraNSWHeritage conservation areas · Sandstone terraces
  • WaverleyNSWCoastal cliff lots · Bondi to Bronte
  • MosmanNSWHarbour foreshore · Tree preservation orders
  • Northern BeachesNSWBAL mapped bushland · Headland sites
  • StonningtonVICToorak & Armadale · Neighbourhood character
  • BaysideVICBrighton & Sandringham · Coastal overlays