Considered
Robust, honest materials, standard glazing.
Feasibility · Transparent fees
Most clients ask two questions first: what will it cost to build, and what will the architect cost? The modeller answers both in seconds, using our own benchmarks from recent Sydney and Melbourne projects.
Build & AIA Fee Modeller
Choose a brief, a floor area, the site, and a specification tier. The modeller returns an indicative construction band, a stage-by-stage architectural fee, and the likely approval pathway.
Indicative construction band
$1.82m to $2.22m
New Coastal Residence · 320 m² · Flat Urban Lot · Bespoke
Architectural fee
$218,000 11% of build
Percentage converts to a fixed lump sum at the end of Sketch Design, so architectural fees never creep with builder variations.
Council DA / Permit
16 to 22 weeks
Complying Development
3 to 6 weeks
NSW non-foreshore lots · VIC uses Planning Permit / VicSmart
Brief to keys
18 to 29 months
Illustrative 2026 Sydney and Melbourne rates, excluding GST, land, landscaping, and loose furniture. Not a quotation.
How our fee works
Our full-service fee is a percentage of the construction cost, fixed as a lump sum at the end of Sketch Design so it never creeps with the build. You pay stage by stage, only as work is delivered.
See what each stage includesSpecification tiers
Robust, honest materials, standard glazing.
Custom joinery, thermally broken steel glazing.
Stone monoliths, off-form concrete, bronze detailing.
Rates are illustrative 2026 construction benchmarks excluding GST, demolition, land, landscaping, pools, and loose furniture. A quantity surveyor cost plan is prepared during Sketch Design.
Commission the studio
Every commission begins with a site walk and an unhurried conversation about light, budget, and how you want to live. We take on eight new residences a year.
Council territory