Collins Street Tower Level 18-24 Acoustic Fitout
Site Challenge & Scope
Scope: 1,640m2 double-glazed Rw 52 acoustic partitions, curved executive boardrooms, and bronze portals.
Live A-grade legal tenancy required Rw 52 speech privacy across 28 partner offices with all glass loaded via goods lift between 19:00 and 05:00.
Engineered Solution
Laser-scanned every floor slab deflection prior to glass cut, prefabricated pre-glazed acoustic door modules in Port Melbourne, and ran 2 electric glass robots overnight.
Verified Outcome
Passed independent acoustic consultant testing on first pass; handed over 5 days ahead of schedule.